Russell Barlow

4th February 2016

Works progressing well on site

Work on site is well underway for a residential development comprising 47 no. affordable dwellings, with associated gardens and access parking.

This includes a mixture of terrace blocks varying in size and semi-detached blocks. The affordable dwellings are to be rented by Home Group based on an assessment of need and demand in the area for this type of housing. All dwellings are to be Code for Sustainable Homes Level 3 and comply with Secure by Design standards.

The first ten houses are to be handed over late march early April then the remainder at 10 per month until completion.

Project_Thumbnail_Maltings.jpg